Thursday, December 4, 2008
Finishing Piling Up
Dawned on me today that I'd better slow down on the weaving because the finishing is really starting to pile up - literally.
While I have 4 cloth rollers, two of them now have yardage stored on them with the 3rd on the loom and being added to already. That means I'd better push the fringe twisting a little harder.
What you can't see is the bucket of shawls woven in September and October that still need to be fringe twisted as well. :}
The beam on the inspection table is the 25 yard warp I just cut off. The red cloth is about 20 yards, maybe a bit less. I cut the cloth off the loom part way through because I needed to get cracking on the place mats. They got taken into the local consignment shop yesterday.
It started to snow today - seriously - although Doug says he heard that it's supposed to warm up. I'm of two minds - I'd rather winter came and stayed, than freeze and melt. On the other hand we have a craft fair to do on Saturday, and I really don't enjoy setting up when the weather is bad. And people don't come out if the roads are nasty.
Only time will tell!
Labels:
fringe twisting
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment